16th Dec 2016, KOG Transport has coordinated the delivery of a 48-tonne THF recovery plant unit from Basel, Switzerland to Patrica in Italy via the Gotthard road tunnel.
The unit, which measured 22 m long by 4.5 m wide and 4 m high, with the equipment of low height platform trailer, was transported by road through the 17 km long tunnel, which has a height limit of just 4.5 m.
KOG Transport deliver 48 ton THF recovery plant unit via Gotthard tunnel,
KOG arranged for the oversize piece to be moved on a flatbed trailer with telescopic chassis, accompanied by a support vehicle and police escort.
Due to the size of the unit the transport had to take place at night, with the entire journey – which totalled about 1,000 km – spanning around six nights.
KOG in Switzerland was contracted by Sulzer to deliver the recovery plant unit, which is used to bind solvents in a production process.
For more news, please share with us and contact: Michael@heavytransporter.com
Hydraulic Modular Trailer 19 Lines
20 axle line Goldhofer THP/SL model hydraulic Modular Traile
48 axle lines Goldhofer PST/SL model SPMT transport 420t Col
E-mail: Michael@heavytransporter.com
Michael@multiaxle.com
Mobile&WhatsApp:+86 186 2193 9474
Add: Sanlin Road, Pudong District, Shanghai,China.