E-mail: michael@multiaxle.com      Mob: +86 186 2193 9474

KOG Transport deliver 48 ton THF recovery plant unit via Got

16th Dec 2016, KOG Transport has coordinated the delivery of a 48-tonne THF recovery plant unit from Basel, Switzerland to Patrica in Italy via the Gotthard road tunnel.

The unit, which measured 22 m long by 4.5 m wide and 4 m high, with the equipment of low height platform trailer, was transported by road through the 17 km long tunnel, which has a height limit of just 4.5 m.

KOG Transport deliver 48 ton THF recovery plant unit via Gotthard tunnel, www.heavyliftphoto.comKOG Transport deliver 48 ton THF recovery plant unit via Gotthard tunnel, 

KOG arranged for the oversize piece to be moved on a flatbed trailer with telescopic chassis, accompanied by a support vehicle and police escort.

Due to the size of the unit the transport had to take place at night, with the entire journey – which totalled about 1,000 km – spanning around six nights.

KOG in Switzerland was contracted by Sulzer to deliver the recovery plant unit, which is used to bind solvents in a production process.

For more news, please share with us and contact: Michael@heavytransporter.com


NEWS

Hydraulic Modular Trailer 19 Lines

100 Axle Lines SPMT

20 axle line Goldhofer THP/SL model hydraulic Modular Traile

48 axle lines Goldhofer PST/SL model SPMT transport 420t Col

Historical Buildings Relocation Transportation by SPMT

CHINA HEAVY TRANSPORTER

SPMT

SHIPYARD TRANSPORTER

MULTI AXLE

SEMI TRAILER

WINDMILL TRAILER

CONTACT

E-mail: Michael@heavytransporter.com
             Michael@multiaxle.com

Mobile&WhatsApp:+86 186 2193 9474

Add: Sanlin Road, Pudong District, Shanghai,China.